Guide · Sutherland Shire Council approvals

Building Approvals in Sutherland Shire: A Builder's Guide

Which approval your project needs, what the Sutherland Shire LEP and DCP control, and how bushfire, flood, heritage and foreshore overlays change the pathway, explained by the builder who manages them.

Book your free discovery call

Takes 30 seconds. Keiron Moore, the builder, runs every site assessment himself.

    Free, no obligation. Or call 02 4271 5132

    • NSW Contractor Licence 258735C (CKS Projects)
    • 2026 MBA NSW award winner for Wombarra Clifftops
    • One fixed-price contract, no provisional sums hiding unknowns

    Pictured: CKS Projects site works above the ocean, NSW.

    The short answer

    Sutherland Shire Approvals, at a Glance

    Most new homes, second storeys and major renovations in Sutherland Shire need one of two approvals: a complying development certificate (CDC) from a certifier, or a development application (DA) to Sutherland Shire Council. Which one depends on the lot and the design.

    This guide is general information, not advice for your site. We confirm the pathway for your block at the site assessment, before the design is locked in.

    Approvals in Sutherland Shire
    CouncilSutherland Shire Council (sutherlandshire.nsw.gov.au)
    Planning instrumentSutherland Shire Local Environmental Plan 2015
    Fast pathwayCDC from a certifier or council, in as little as 20 days, where the state standards are met
    Standard pathwayDA to Sutherland Shire Council, then a construction certificate
    Start hereThe section 10.7 planning certificate for your lot
    Also neededBASIX certificate for every new home
    CDC or DA

    Which Approval Does My Project Need?

    Three pathways cover most home building work. The lot's controls and the design decide which one applies.

    Approval pathways for home building work in NSW
    PathwayWho approves itWhen it applies
    Exempt developmentNo approval neededMinor, low-impact work that meets the exempt standards
    Complying development (CDC)A private certifier or council, in as little as 20 daysProjects that meet set state standards: many new houses and alterations and additions under the Housing Code, and dual occupancies of up to two storeys under the Low Rise Housing Diversity Code
    Development application (DA)Sutherland Shire Council, then a construction certificate and a principal certifierProjects outside the standards, and commonly land with heritage, bushfire, flood or foreshore controls

    Sources: NSW Planning, complying development · NSW Planning Portal, BASIX · NSW Planning, low and mid-rise housing.

    The rules

    What the Sutherland Shire LEP and DCP Control

    Two documents shape what can be built on a Shire lot, and they work at different levels.

    Sutherland Shire LEP 2015

    The legal planning instrument: land use zones and development standards such as maximum building height, floor space ratio and minimum lot size, plus the list of heritage items. It has its own clause on minimum lot sizes for dual occupancies. Read the LEP.

    The development control plan (DCP)

    Detailed design guidance that applies to a development application: things like setbacks, landscaping and privacy. It is published by Sutherland Shire Council. A CDC is assessed against the state codes instead.

    Overlays

    Bushfire, Flood, Heritage and Foreshore Controls

    Parts of the Shire carry overlays that change the design and often the pathway. The section 10.7 planning certificate for the lot discloses them.

    Bushfire prone land

    Development must meet the NSW RFS Planning for Bush Fire Protection 2019. The BAL rating sets requirements for cladding, glazing, decks and roofing. NSW RFS.

    Flood planning

    On flood-affected land the finished floor level is set relative to the flood planning level, which can change the slab and the height of the house.

    Heritage

    Heritage items and conservation areas change what can be demolished or added, and usually mean a DA.

    Waterfront and foreshore

    Lots on the Georges River, the Woronora River and Port Hacking can carry foreshore and flood controls that shape where and how high you can build.

    Building across the river? In the Georges River council area the instrument is the Georges River Local Environmental Plan 2021, not the Sutherland Shire LEP. The state pathways above are the same. See the Georges River area.

    Common questions

    Sutherland Shire Approvals FAQs

    What is the Sutherland Shire LEP?

    The Sutherland Shire Local Environmental Plan 2015 is the legal planning instrument for the Shire. It sets the land use zones and development standards such as maximum building height, floor space ratio and minimum lot size, and lists heritage items. It also has its own clause on minimum lot sizes for dual occupancies. You can read it on the NSW legislation website.

    What is the difference between the LEP and the DCP?

    The LEP is the legal instrument: zones and development standards. The council's development control plan (DCP) adds detailed design guidance that applies to a development application, such as setbacks, landscaping and privacy. A complying development certificate is assessed against the state codes instead.

    CDC or DA: which do I need?

    A complying development certificate (CDC) is issued by a private certifier or council for projects that meet set state standards, in as little as 20 days. It covers many new houses and alterations and additions under the Housing Code, and dual occupancies of up to two storeys under the Low Rise Housing Diversity Code. Anything outside those standards, or on land with certain constraints, needs a development application (DA) to Sutherland Shire Council. Heritage, bushfire, flood and foreshore controls commonly mean a DA.

    How do I find out which controls apply to my block?

    Start with the section 10.7 planning certificate for the lot, which discloses the zoning and the overlays affecting the land, such as bushfire prone land, flood planning, heritage and foreshore controls. The LEP maps show the zoning and standards too. We read both at the site assessment.

    Is my block bushfire prone, and what changes if it is?

    The planning certificate tells you. Development on bushfire prone land must meet the NSW RFS Planning for Bush Fire Protection 2019. A Bushfire Attack Level (BAL) assessment then sets requirements for cladding, glazing, decks and roofing, and bushfire prone land often means a DA rather than a CDC.

    What happens after a DA is approved?

    A construction certificate and a principal certifier are needed before building work starts. Every new home also needs a BASIX certificate, and renovations and extensions need one above a set cost of works.

    Can I build a duplex in Sutherland Shire?

    Often. Since 1 July 2024, dual occupancies have been permitted in the R2 Low Density Residential zone across NSW, subject to local controls such as minimum lot size, which the Sutherland Shire LEP 2015 sets in its own clause. See duplex builders in Sutherland Shire.

    Not sure which pathway applies?

    Ask the Builder About Your Block

    Send the address. At the site assessment we read the planning certificate and the LEP maps for your lot and tell you which approval the project needs, before any design money is spent.